Právě stavíme - divize Pozemní stavby Čechy
Řevnice, Repair to water mains and providing flood defences
23.4.2014
Erecting a new water tower with a capacity of 2 x 500m3 will increase drinking water reserves supplying the local region.
Svitavy, Flood Control Measures
23.4.2014
The town of Svitavy will be protected from a 50-year flood.
Prachatice, Sewage treatment plant
23.4.2014
The wastewater treatment plant in Prachatice is undergoing a rehabilitation of the damaged first stage of the biologic treatment caused by flooding in 2002.
Sedlec-Prčice, Wastewater Treatment Plant and Sewerage
23.4.2014
The conglomerate of Sedlec and Prčice municipalities is building a sewerage system and wastewater treatment plant co-funded by the European Union.
Humpolec, Intensification of Wastewater Treatment Plant and Sewerage
23.4.2014
Intenzifikace čistírny odpadních vod v Humpolci postupovala po jednotlivých etapách, během kterých byl provoz jen částečně omezen – předem přísně stanoveným způsobem podle daného harmonogramu prací.
Plzeň, Čistá voda (Clean Water)
23.4.2014
České Budějovice, Hospital
23.4.2014
The reconstruction consists in a comprehensive modernisation of an old building that did not meet the basic requirements of health service.
České Budějovice, The Československá obchodní banka building
23.4.2014
The building of the bank is situated on the busiest avenue of České Budějovice. Once a residential house, it has been reconstructed and enlarged by an extension in the garden and by the construction of underground garage spaces.
Prague, Office Building Myslbek
23.4.2014
The Myslbek Building is located in the heart of Prague and completes the vacant space between the streets Na Příkopě and Ovocný trh (Fruit Market). The construction consists of four underground and six above ground floors.
Prague, PVT Administration and Operation Building
23.4.2014
The new office complex has risen in Prague 5 near Radlicka radial motorway.The building is envisaged for commercial space for rent, i.e. offices with facilities of a corresponding niveau, with a common canteen and an underground car park. There are five aboveground storeys (plus roof superstructures above the lift cores) and two underground storeys.
České Budějovice, the Czech National Bank building
23.4.2014
The building is a dominant feature of the town centre at the corner of the streets Na sadech and Lannova avenue. The old historical building was reconstructed and an extension added after demolition of two neighbouring apartment houses.
Prague, Raiffeisen Savings Bank
23.4.2014
In the building there is a bank hall for meetings, an information technology centre, a conference hall, a lunchroom for employees and offices for approximately 250 employees. There are also 8 apartments and an underground car park for 80 cars.
Český Krumlov, The Růže Hotel
23.4.2014
General refurbishment of the original building, construction of a fitness centre on the former terrace and interconnection of the two hotel structures, including new and complete technical facilities.
Děčín, Reconstruction of Jordanka Compound
23.4.2014
Reconstruction and extension have been carried out on the premises of a former chocolate factory in the centre of the town. Thanks to the reconstruction, a new multipurpose facility arose which houses shops, restaurants, apartments and offices. The building is connected with the central pedestrian zone.
Prague, Office building Hadovka
23.4.2014
The project consists of four buildings with the possiblity of interconnection. There are five aboveground and two underground floors.Beside office space for rent the buildings provide comfortable service facilities.